http://www.sheilaoliver.org/cost-now–10m.html

The cost is £10m with no proper explanation of this ludicrous rise. A bigger school built several years later is to cost £8m. At this point Stockport Council was still lying that the site was not contaminated, although they had refused three planning applications in the early 1970s due to the contaminated nature of the site.