Blog Image

Stockport Council News

Drainage problems

Bypass Posted on Fri, February 06, 2015 13:29

I know there is a problem with drainage on the land, as I have told SMBC repeatedly. They never listen.

Condition of existing drainage (incl land

and road) not serviceable for

connection into as required by the

design. Existing network not in a

sufficiently serviceable condition or of

sufficient capacity.

Design phase preparation

works and consultation

activities

Additional costs and

programme delay may

occur



Fingers crossed they don’t.

Bypass Posted on Fri, February 06, 2015 13:25

Unforeseen Statutory Undertakers

diversions are required due to

unchartered services being discovered

Unchartered services being

located.

Additional costs and

programme delay may

occur



Sign up on Woodford Rd stating work is starting on bypass in February – it can’t until March 31st

Bypass Posted on Fri, February 06, 2015 10:57

The road cannot be started until 31st March 2015 until the end of the judicial review process notice period.

I have informed the Leader, Councillor Derbyshire, The Council Chief Executive Eamonn Boylan and the Council Solicitor of this today. Let’s hope for once they act within the law.



No, more potential rising costs – yet money is tight

Bypass Posted on Fri, February 06, 2015 10:48

The proposed works clash with the

location of an ENWL Sub-Station. The

boundary fencing & arcing distances is

the issue.

Changing design

requirements

Increased design and

construction costs



Lisa Smart LibDem PPC was very rude to me yesterday, today she writes asking for my vote

Lisa Smart LibDem PPC Posted on Fri, February 06, 2015 10:00

Yesterday, the mask slipped and I saw the true Lisa Smart, LibDem PPC when I called at the constituency office I fund to raise the issue of the death of Mr Parnell at the hands of Stockport LibDems.

Today she writes to me asking me to vote for her. I think the answer is no, Local Lisa.



Yep, you’ve guessed it – more rising costs.

Bypass Posted on Fri, February 06, 2015 09:41

The proposed works clash with the

location of an ENWL Sub-Station.

The boundary fencing & arcing distances is

the issue.

Changing design

requirements

Increased design and

construction costs



Flippin’ ‘eck, dodgy LibDem road for votes even interferes with airport landing lights. Strewth!

Bypass Posted on Fri, February 06, 2015 09:40

Only the incompetent LibDems could bring that about

The ex aircraft landing light that will be

located in the new central reserve of the

proposed works has to be lowered

every week for maintenance checks.

This will require traffic management, the

provision of which Manchester Airport

may object to.

Changing design

requirements

Increased design and

construction costs



Dodgy LibDem road for votes could land us with huge bill to Network Rail

Bypass Posted on Fri, February 06, 2015 09:37

Additional NR track possessions

required for construction/additional cost

to NR possessions. Bridge 14 and 15

SMBC issues still so separate risk

required.

Design phase preparation

works and consultation

activities

Increase in SMBC

payment to NR



Next »