“Increased Thickness of thin Surfacing
required along the length of the
scheme.
Design phase preparation
works and consultation
activities
Scheme delayed and
budgets are compromised”
The bent Stockport LibDems are doing this on a shoestring. Who is going to pay cost overruns? I have been asking this all along.

